ARMSNET
Military Equipment Database
Initializing 0%

Project 671RTM

Project 671RTM

Attack Submarines
Spotted an error? Sign in to suggest an edit.
Basic Information
Name
Project 671RTM
Designation
Project 671RTM
Alternate Designation
Project 671RTMK, Shuka (Soviet name), Victor III (NATO code)
Equipment Type
Attack Submarines
Manufacturer
Admiralty Shipyards, Amur Shipyard
Date of Introduction
1978
Description

The Project 671 is a class of nuclear-powered attack submarines deployed by the former Soviet Union between the late 1960s and early 1990s to engage submarines and surface ships. The whole Project 671 class comprises 48 ships in three versions: Project 671/Yersy/Victor I (15 ships 1968-1974), Project 671RT/Semga/Victor II (7 ships 1972-1978) and Project 671RTM/Shuka/Victor III (26 ships 1978-1992). Currently, Project 671RTM ships are the sole survivors of Project 671 submarine-class within the Russian Navy. Several of these ships are expected to remain in service with the Russian Navy until 2010/2015 when they should be phased out. The Project 671RTM, Soviet name Shuka and NATO codename Victor III, is an improved version built on Project 671RT/Victor II design and aimed at reducing the acoustic signature over its predecessors. The lead ship was commissioned by the Soviet Navy in 1978. These ships are powered by two nuclear pressurized water reactors, were provided with four 21-inch torpedo tubes and two 25.6-inch torpedo tubes and feature improved communications and electronic gear. These ships are equipped with torpedoes and anti-ship/submarine missiles and several are fitted with Granat, Soviet name RKV-500 or NATO code SS-N-21 Sampson, land attack cruise missiles. The Porject 671RTMK is an upgraded variant to be delivered to the Russian Navy in 2023.

Naval & Littoral Specifications
Crew 85
Beam 10.80 m
Draft 8.00 m
Overview (Deagel)
Group Attack Submarines
Status Active
Also Known As Project 671RTMK, Shuka (Soviet name), Victor III (NATO code)
Origin Russia
Contractors Admiralty Shipyards, Amur Shipyard
Initial Operational Capability (IOC) 1978
Total Production 26
Specifications (Deagel)
Crew 85
Number of Weapons 18
Torpedo Tubes 6
Dimensions — Beam 10.8 meter
Dimensions — Draft 8 meter
Dimensions — Length 107 meter
Mass — Displacement Submerged 7,200 ton
Mass — Displacement Surfaced 5,200 ton
Performance — Max Operating Depth 400 meter
Power — Power 75 MW
Speed — Top Speed Submerged 30 knot
Speed — Top Speed Surfaced 20 knot
Time — Mission Endurance 80 day
Gear (Deagel)
Item 1 Anti-Ship Missiles: SS-N-22 Sunburn (6)
Item 2 Anti-Submarine Rockets: SS-N-15 Starfish (2)
Item 3 Anti-Submarine Rockets: SS-N-16 Stallion (6)
Item 4 Cruise Missiles: SS-N-21 Sampson (2)
Item 5 Torpedoes: 53-65K (18)
Item 6 Torpedoes: 65-76
Item 7 Torpedoes: 65-76A
Details
Country of Origin Russia
Category Submarines
Naval > Submarines
Classification
Domain
Naval & Littoral
Equipment Status
Active
Dimensions
Length
107 m
Width
10.8 m
Height
—
Weight
—
Operators (1)
Russia
Something went wrong. Please reload the page. Reload