ARMSNET
Military Equipment Database
Initializing 0%

GBU-30 JDAM

GBU-30 JDAM

Bombs
Spotted an error? Sign in to suggest an edit.
Basic Information
Name
GBU-30 JDAM
Designation
GBU-30 JDAM
Alternate Designation
Equipment Type
Bombs
Manufacturer
Boeing
Date of Introduction
1999
Description

The GBU-30 bomb uses a 500-lb Mk-82 or BLU-111/B warhead to destroy general targets. Boeing delivered the 100,000th JDAM tail kit on December 2, 2004, to the US military since production started in 1998. Initial production was 900 tail kits per year, but as of December 2004 and following 9/11 terrorist attacks, tail kit production boosted and stands at 3,000 units per month. These tail kits provide precision strike capability to Mk 80 series bombs through GPS-aided navigation. To date, the US Air Force has received more than 50,000 JDAMs, the US Navy roughly 37,000 units, and the remaining tail kits (10,000?) were produced for international customers. Boeing was awarded JDAM Lot 9 production contract valued at $609 million on 31-March-2005. The US Air Force Lot 9 contract called for 30,072 JDAM tail kits with 60 percent of those kits to be produced for 500-pound bombs (GBU-38). As of March 2005, Boeing has produced more than 112,000 JDAM tail kits. In October 2005 Australia's Department of Defense awarded Boeing a contract to provide 500-2000 pounds JDAM weapon systems in support of the Royal Australian Air Force's F/A-18 combat aircraft fleet. In February 2006 Norway signed for the JDAM bomb to equip its F-16 fighter aircraft fleet providing all-weather, autonomous and accurate strike capability against a broad spectrum of targets. With this decision Norway became the 14th international and the fifth European customer for JDAM. In parallel, Boeing released that 140,000 JDAM bomb kits had been delivered to the US and international customers since production series started in 1998. In early March 2006 Boeing was awarded JDAM Lot 10 production contract for 10,000 JDAM tail kits for 500-, 1,000-, and 2,000-pound bombs owned by the US Air Force and the US Navy. This new contract was valued at $240 million and tail kits deliveries were slated for completion by February 2008.

Ground Specifications
Range 24.0 km
Overview (Deagel)
Group Bombs
Status Active
Origin United States of America
Contractor Boeing
Initial Operational Capability (IOC) 1999
Total Production ?
Unitary Cost USD $21,000
Specifications (Deagel)
Dimensions — Diameter 500 millimeter
Dimensions — Length 3 meter
Mass — Weight 230 kilogram
Performance — CEP 13 meter
Performance — Max Launch Altitude 13,700 meter
Performance — Max Range 24,000 meter
Gear (Deagel)
Item 1 Bombs: BLU-111 (1)
Variants
Variant 1 GBU-31 JDAM
Variant 2 GBU-30 JDAM
Variant 3 GBU-32 JDAM
Variant 4 GBU-35 JDAM
Variant 5 GBU-38 JDAM
Variant 6 JDAM DAMASK
Variant 7 JDAM ER
Details
Country of Origin United States
Classification
Domain
Ground
Equipment Status
Active
Dimensions
Length
3 m
Width
Height
Weight
230 kg
Operators (11)
United States
Israel
Italy
South Korea
Poland
Australia
Belgium
Denmark
Netherlands
Norway
Portugal
Something went wrong. Please reload the page. Reload