Typhoon T
Typhoon T
The two-seat Typhoon multi-role fighter will be able to perform surveillance, air defense, deep strike, close air support, anti-ship, reconnaissance and training missions. The two-seater Typhoon features slightly reduced performance figures. The United Kingdom, Germany, Italy and Spain have plans to purchase up to 620 Typhoons, excluding options. Greece and Austria intend to purchase 60+30 and 24 Typhoons respectively. The new aircraft will replace Jaguar, Mirage F1, F-4, MiG-29, F-104, F-5, and Tornado aircraft in service in many European Air Forces beginning in 2003 through 2014. As of December 2004, the first batch of Typhoon fighter aircraft was being executed with 34 of the 148 aircraft already delivered to the four-nation Air Forces and some 50 in the final assembly expected to be delivered soon. The second tranche, comprising 236 aircraft, was being negotiated between the four partner nations. The Memorandum of Understanding (MoU) for the second tranche of Eurofighter-Typhoon aircraft was signed between NATO Eurofighter and Tornado Management Agency (NETMA) and Eurofighter Jagdflugzeuge GmbH on December 17, 2004. The agreement worth €14 billion will deliver 236 multi-role standard Eurofighter aircraft featuring new software and state-of-the-art weaponry. Of the 236 aircraft to be manufactured under second batch United Kingdom will receive 89, Germany 68, Italy 46 and Spain 33. In Addition, the first export customer, Austria, will receive 18 tranche 2 Eurofighters with multi-role air-to-air and air-to-ground capabilities. Deliveries will occur from 2008 onwards. On 31 March 2006 the RAF announced the formation of the 3(F) Squadron equipped with Typhoon multi-mission aircraft near coinciding with the anniversary of the RAF formation on 1 April 1918. The first Typhoon-equipped squadron is based at RAF Conningsby in Lincolnshire.
deagel.com: https://www.deagel.com/x/x/a000442